PCC windmill logoPROTECT
CHERRY COUNTY
Learn more. See the sources.

CHERRY COUNTY, NEBRASKA

The source library

Original documents, dated replies, and the records behind each summary.

11 core sources • Agency records • Printable briefs

Source index

Start with the numbered sources below. PCC summaries explain the documents; they do not replace them. Source dates identify the record, not a guarantee of today’s operating conditions.

  1. City of Valentine nitrate notice, Sept. 17, 2026City press release carried by News Channel Nebraska; a dated notice, not a live status feed.
  2. DWEE reply, RM-2026-749, Sept. 30, 2026Agency statements on Well 501, laboratory reports, PFAS monitoring and withheld maps. Selected text reproduced with access keys and contact details omitted.
  3. DWEE reply, RM-2026-747, Sept. 29, 2026Agency statement on the public Wellhead layer and withheld records.
  4. TK Angus groundwater-monitoring plan, Aug. 17, 2026Received Aug. 19; DWEE record 20260091409. Sections 3.1-3.2, 4.2-4.6 and 6.
  5. DWEE permit and responses, Aug. 13-14, 2026Search Facility 124885. Permit record 20260091375, conditions 2-4; public-comment response record 20260058852. The portal requires JavaScript.
  6. Nebraska Elections Division reply, Sept. 29, 2026Written guidance from Elections Director Andrew Buller. Related statute: section 32-554.
  7. U.S. Census Bureau QuickFacts: Cherry CountyVintage 2025 estimate and estimates base; 2010 and 2020 Census counts. Checked Sept. 30.
  8. NIRMA Property/Liability PoolCoverage description, including the separate privacy/security retention. Checked Sept. 30.
  9. FERC order, BSH Kilgore, July 27, 2026Docket ER26-2752-000. Read with the June 8 SPP cancellation filing.
  10. Drinking Water Watch: Valentine facilitiesSystem NE3103106. A database facility status is not a time-stamped pumping log.
  11. Drinking Water Watch: Aug. 26 sample 1065281State database labels the analyte NITRATE-NITRITE and lists 11.1 mg/L. This is one result, not the two-sample average in the City notice.

Kilgore filing and order

SPP cancellation filing, June 8, 2026
FERC order, July 27, 2026

The order concerns the generator interconnection agreement. Keep it separate from other transmission projects and litigation.

Saved copies: FERC order (PDF) · SPP filing (PDF).

Agency and county search tools

Valentine agency file

Use the DWEE public portal; search Facility 999585. Drinking-water system ID: NE3103106.

TK Angus agency file

Use the DWEE docket; search Facility 124885, LWC. Search by record date and document title.

PCC summaries

One-page current summary